How we work / Build, connect, improve

KNOW WHAT YOU’RE GETTING.

Know what gets built, how the pieces connect and what happens after launch. Start with a defined project or a diagnostic for ongoing improvement.

A studio team aligning, checking and handing over the connected sections of a bridge on a workbench.
Before the build
Scope agreed
Along the way
Review points
At handover
Documentation

Four stages, each with
something to review.

The milestones follow your project’s scope. Every stage has a clear output, so your team knows what it is reviewing and what comes next.

  1. Agree the job.

    We review the brief, your existing tools and the connections the project needs. Together we define what gets built, what stays outside the scope and how we will check the result.

    A scope you can review

    Deliverables, responsibilities, cost, milestones and acceptance checks.

  2. Get the inputs ready.

    Your team provides approved copy, creative assets and access. We confirm page structure, data mappings and the messages each workflow will use before building around them.

    A build-ready brief

    Approved inputs, access requirements and a clear plan for review.

  3. Build. Connect. Test.

    We design and develop the agreed pages, configure the workflows and connect the tracking. Reviews happen at the agreed milestones, with forms and handoffs tested together.

    A system ready to use

    A reviewable build, tested connections and the agreed fixes completed.

  4. Hand it over properly.

    We walk your team through the setup and provide documentation. For ongoing optimisation, we review results, agree the next priorities and continue with a monthly improvement cycle.

    A handover your team can use

    A walkthrough, setup notes and clarity about ongoing ownership and support.

No waiting on
a missing answer.

We agree responsibilities early so the project can move without waiting on an unanswered question or a missing asset.

We build, connect and improve.

  • Design and development within the agreed scope.
  • CRM configuration, workflows and integrations.
  • Measurement, testing and agreed performance improvements.
  • A walkthrough of the finished system.

You bring the business context.

  • Approved copy, creative assets and workflow messages.
  • Access to the platforms and accounts involved.
  • A project owner who can gather and approve feedback.
  • Content, campaign and sales ownership after launch.

Start where the
work needs to happen.

Choose a defined build or a continuing improvement cycle. We agree the scope, responsibilities and cost before work starts.

Website builds

A B2B website or focused landing page, with forms, CMS and connections to the tools you already use.

Fixed scope. Pages, integrations, milestones and cost agreed before work starts.

Websites & landing pages

Automation projects

CRM, lead routing, follow-up and connections between tools that reduce repetitive work.

Fixed scope. Workflows, data requirements and acceptance checks agreed before the build.

Automation & integrations

Ongoing optimisation

Start with a diagnostic, then review performance, agree priorities and implement improvements to pages, forms and workflows.

A defined diagnostic, followed by an optional monthly engagement. Improvement capacity, reviews and fees agreed together.

Measurement & optimisation

An example scope / Website enquiry flow

Make the handoff
part of the build.

A landing page is one part of the job. The brief also needs to define what happens when someone submits the form.

See a website project in practice
The deliverables
An agreed page, a working enquiry form and the connection to your CRM or inbox.
Your inputs
Approved content, account access and the person who should receive the enquiry.
The acceptance check
A test enquiry reaches the right destination, retains the required context and records the agreed conversion event.
The handover
Your team knows where enquiries arrive and how to check the connection.

Before we start.

How long does a project take?

Timing depends on the number of pages or workflows, the integrations involved and how ready the content and access are. We set milestones after reviewing those dependencies, before you commit to the build.

Do we need to replace all our tools?

No. Each project can stand on its own and connect to your existing setup. We check platform limits and integration options when we agree the scope.

Who writes the content and runs the campaigns?

Your team supplies approved copy, assets and messages, and continues to manage campaigns. Our work covers the design, development, integrations and ongoing improvements agreed in the scope.

Do we need a strategy project first?

No. You can commission a website, an automation project or an optimisation diagnostic directly. Apostolos also offers a separate Strategy Blueprint for deciding what to do first, but it is never a requirement for a defined build.

What if we do not know what needs fixing?

Start with a conversation. If the problem needs a closer look, the free Growth Audit gives you three prioritised website improvements within two working days. Deeper investigation is scoped separately.

Two hands passing an open project folder with a finished page layout and checked handover documentation.

BRING THE BRIEF.
OR THE QUESTION.

Tell us what needs to work. We’ll help you decide whether to scope a build or investigate the problem first.